[TK NAME]

บันทึก

Notes.

What 38 samples a month looks like

I take readings at 30 fixed monitoring points in 3 villages, about 40 km from [CITY]. We collect 38 samples a month. At each point, I fill a bucket, dip a test strip, and read turbidity and pH with a handheld meter. The point has its own ID. We use the same spot each time.

I type the reading into a shared sheet with the point ID and the time. There are 12 volunteers, with 4 on the core team. The small model reads that sheet and estimates flood onset 6–18 h ahead. When it estimates a flood, we send a WhatsApp alert to the village group.

Six school visits

We make 6 visits to 2 schools, with 400 students. I show them the method we use to take water readings. We fill a bucket, dip a test strip, and read turbidity and pH with a handheld meter. We put each reading into a shared sheet with the point ID and the time.

What the students said: [TK].

The model fails when it rains

We miss readings when it rains, which is exactly when floods start. I use a small model to estimate flood onset 6–18 h ahead, but that lead time is only as good as the readings. The model reads the shared sheet. When we miss a reading, we miss it at the time people need to know before the water arrives.

We have 200 samples across 18 months. That is small n for a model. The handheld meter drifts over time. There is no lab calibration, and nothing has been checked against a lab. I cannot fill those gaps with the lead time. What we are trying next is [TK].